Monday, November 28, 2016

11-17-2016 erosion control and seeding


Set silk sock on the South West side of the bridge for erosion control prior to spraying seed and mulch.


Set the silk sock on the South East side of the bridge for erosion control prior to spraying seed and mulch.


Silk sock added to the South East side of bridge just above the rip rap.


Crew spraying seed and mulch on the East bridge approach.



Setting the silk sock for erosion control, on the North East side on the bridge project.




Placing silk sock for erosion control on the North West side of the bridge.