| Set silk sock on the South West side of the bridge for erosion control prior to spraying seed and mulch. |
| Set the silk sock on the South East side of the bridge for erosion control prior to spraying seed and mulch. |
| Silk sock added to the South East side of bridge just above the rip rap. |
| Crew spraying seed and mulch on the East bridge approach. |
| Setting the silk sock for erosion control, on the North East side on the bridge project. |
| Placing silk sock for erosion control on the North West side of the bridge. |
No comments:
Post a Comment