Wednesday, November 16, 2016

Site visit with Contractor

 Contractor was ready to walk through site, site was in good shape. there was a couple thing that i ask him to address, the roadway had a couple pot holes that needed fixed and the other was silt sock. Contractor informed me that the seeding and erosion will be installed on Thursday the 17th.













 Contractor is going to grade the road one more time before removing equipment.